Factory introduction
|
1. Sheet metal processing (material cut bending) area operator 90 people
Sheet metal processing area at the 1st factory (mass production line ②) | Second factory sheet metal processing area (mass production line ①) | ||
Fiber laser cutting machine | NC turret punch press | Bending machine | Pem fastener dedicated press machine |
Laser cutting machine | NC turret punch press |
Bending machine | Pem fastener dedicated press machine |
2. Welding area welders 119 people
First factory welding area |
Second factory welding area | ||
Semi-automatic welding (MAG) robot | TIG welding robot |
Fiber Laser welding robot | Semi-automatic welding (MIG) |
TIG welding |
Coated arc welding |
Spot welding |
Semi-automatic welding (MAG) |
3. Cutting area operator 42 people
Second factory Large machining area |
Second factory Small machining, lathe, milling area | ||
|
|
|
|
|
|
|
|
4. Painting area painters 45 people
1st automatic powder coating line | 2nd automatic powder coating line | ||
Automatic powder coating booth |
Powder coating booth |
Solvent coating booth |
Baking furnace (batch furnace) |
5. Assembly area 49 assembly workers
1st Factory 1F Assembly Room (1200㎡) |
1st factory 2F assembly room (1500㎡) | ||
Electrical parts assembly | Control board assembly | Board housing assembly | Bus duct assembly |
6. Inspection area 45 inspectors
Finishing inspection area | Pre-painting inspection area | ||
Material hardness inspection |
Three-dimensional measurement inspection | Image size measurement inspection |
Dimensional inspection |
Jig inspection |
Coating quality (color difference) inspection |
Coating quality (gloss) inspection |
Coating quality (film thickness) inspection |
7. Shipping area
container yard i |
Inside the container yard | ||
|
|
|
|
8. Material storage area
Storage of small parts |
Large parts storage |
9. Fine coating area
Coating room |
Sandblasting equipment |
Inspection room |
Mirror finishing, packing area |





